No Comments Chapter 33 APPENDIX S: DEVELOPER CONTRIBUTIONS FOR NEW PROVISION / ENHANCEMENT OF OPEN SPACE

The following figures give the commuted sum rates for enhancement of existing open spaces and provision of new open spaces. They are based on the 2015 Integrated Contract rate for HDC and will be updated annually. The cost for laying out a new open space, as appropriate by category and are calculated by multiplying the 'provision rate per 1000 persons' (rates based on Appendix 1, Column 3) by the 'cost of laying out per Ha'. The new provision rate includes a land value of £30,000.00 per hectare as an additional cost for laying out the facility, but is otherwise identical to the enhancement calculation.

Calculations for development of new open spaces

Parks and Gardens

Task Works

Rate

Measure per hectare cost per ha inc uplifts
£

Clearance

Clear virgin ground

£0.37

per m2

10000

m2

£4,092.20

Pathways and car park

Provide and install 15% pathways

£34.00

per m2

1500

m2

£56,406.00

Planted Areas

40% Planted areas

4000

m2

£0.00

Shrubs

Provide 10% informal shrubs

£5.00

per m2

1000

m2

£5,530.00

Prepare and plant

£3.92

per m2

1000

m2

£4,335.52

Provide 30% formal shrubs

£20.00

per m2

3000

m2

£66,360.00

Prepare and plant

£3.92

per m2

3000

m2

£13,006.56

Grass

Grass at 45%

4500

m2

£0.00

Supply and spread topsoil to 150mm

£2.34

per m2

4500

m2

£11,646.18

Supply and sow grass seed

£2.19

per m2

4500

m2

£10,899.63

Trees

Supply trees

£75.00

1no

20

no

£1,659.00

Plant trees with underground anchors

£51.43

1no

20

no

£1,137.63

Signage

Supply POS signs

£1,500.00

ea

2

no

£3,318.00

Features

Cost of ornamental features, bandstand, toilets etc

£20,000.00

ea

1

no

£22,120.00

Hedging

Provide ornamental hedging

£8.80

per lin m

200

no

£1,946.56

Plant ornamental hedge

£5.76

per lin m

200

no

£1,274.11

Fencing

Temporary fencing for hedges (chespale 900mm inc removal)

£11.57

per lin m

200

no

£2,559.28

Permanent fencing to 30% of perimeter (kneerail)

£78.67

per lin m

120

no

£10,441.08

Seating

Supply and install seats

£550.00

ea

6

no

£3,649.80

Bins

Supply and install litter bins

£300.00

ea

3

no

£995.40

Supply and install dog bins

£350.00

ea

3

no

£1,161.30

total

£222,538.26

land cost per ha

£30,000.00

Provision rate per 1000 pop (Ha)

0.4

calculation

Rate per person refurb

£89.02

Rate per person new provision

£101.02

Outdoor Sports Facilities

Based on

New artificial pitch facility at northampton Road Sports Ground

£500,000.00

New changing facilites at Northamton Road

£500,000.00

Renovation of artificial pitch at Welland Park Communiy Collage

£250,000.00

New 8 grass pitch provision from Sport England @ 50k per pitch

£400,000.00

New 3G pitch at Kibworth School

£570,000.00

£2,220,000.00

Ave cost of project

total

£444,000.00

Land cost per ha

£30,000.00

Provision rate using HDC adopted standard per 1000 pop (Ha)

1.6

Rate per person refurb

£710.40

Rate per person new facility

£758.40

Amenity Greenspace

Task Works Rate Measure per hectare Cost per ha inc uplifts
£

Clearance

Clear virgin ground

£0.37

per m2

10000

m2

£4,092.20

Pathways and car park

Provide and install 15% pathways

£34.00

per m2

500

m2

£18,802.00

Shrubs

Provide 10% informal shrubs (whips)

£5.00

per m2

1000

m2

£5,530.00

Prepare and plant

£3.92

per m2

1000

m2

£4,335.52

Grass

Grass at 75%

4500

m2

£0.00

prepare grass areas

£2.34

per m2

4500

m2

£11,646.18

Supply and sow grass seed

£2.19

per m2

4500

m2

£10,899.63

Trees

Supply trees

£75.00

1no

40

no

£3,318.00

Plant trees with underground anchors

£51.43

1no

40

no

£2,275.26

Hedging

Provide hedging

£8.00

per lin m

200

no

£1,769.60

Plant hedge

£5.76

per lin m

200

no

£1,274.11

Fencing

Permanent fencing to 30% of perimeter (kneerail)

£78.67

per lin m

120

no

£10,441.08

Seating

Supply and install seats

£550.00

ea

3

no

£1,824.90

Bins

Supply and install litter bins

£300.00

ea

3

no

£995.40

Supply and install dog bins

£350.00

ea

3

no

£1,161.30

total

£78,365.19

land cost per ha

£30,000.00

Provision rate per 1000 pop (Ha)

0.9

Rate per person refurb

£70.53

Rate per person new provision

£97.53

Children and Young People

Task Works

Rate

Measure per LEAP Cost per ha inc uplifts
£

Supply of Equipment for LEAP (400m2)

Pathways and car park

Provide and install 10% pathways

£34.00

per m2

40

m2

£1,504.16

Car Park adjacent to LEAP

£34.00

per m2

200

m2

£7,520.80

Play equipment inc VAT and delivery

Supply multiplay unit

£35,000.00

ea

1

ea

£38,710.00

supply swings (cradle and pod)

£7,500.00

ea

2

ea

£16,590.00

supply springers

£1,200.00

ea

2

ea

£2,654.40

supply other moving unit

£8,000.00

ea

1

ea

£8,848.00

supply u6s multiplay

£15,000.00

ea

1

ea

£16,590.00

surfacing

supply surfacing at 50%

£0.00

20% wetpour

£69.00

per m2

40

m2

£3,052.56

60% enviromulch

£35.00

per m3

18

m3

£696.78

20% sand

£35.00

per m3

25

m3

£967.75

Retainers and stockading

supply log stockading

£60.00

per lin m

100

lin m

£6,636.00

Groundworks and reinstatement

Excavation and landscaping

£5,000.00

1no

1

no

£5,530.00

Fencing

Permanent fencing to 100% of perimeter (bowtop) inc gates

£55.00

per lin m

190

no

£11,557.70

Seating

Supply and install seats

£550.00

ea

2

no

£1,216.60

Bins

Supply and install litter bins

£300.00

ea

2

no

£663.60

Supply and install dog bins

£350.00

ea

2

no

£774.20

Installation

Installation of above

£40,000.00

ea

1

ea

£44,240.00

total

£167,752.55

land cost per ha

£24,000.00

Provision rate per 1000 pop (Ha)

0.3

Rate per person refurb

£5.03

Rate per person new provision

£5.75

The LEAP standard has an activity zone that is a minimum of 400m2 (0.04 Ha) contains at least 5 pieces of equipment that encourage particular types of play. We define the appropriate types as Rotary Play, Swinging, Sliding, Climbing and Rocking/See Saw Motions.

All play equipment must conform to EN1176 and En1177. A buffer zone not less than 20m in depth should be present between the LEAP and the nearest dwelling's habitable rooms, with a minimum of 10m to the nearest residential boundary. This zone should ideally include some planting to allow children to experience natural scents, colours and textures. Please note that the buffer zone can be dual-use, eg provision of Amenity Greenspace as part of this buffer zone. Play areas and their buffer zones should be located in residential areas or else close to well-used footpaths, so that child safety is increased through passive observation. The activity zone should be enclosed by a fence of at least 1m in height, with two outward-opening, self-closing pedestrian gates on opposite sides of the site (to deter bullying and entry by dogs), with barriers to limit the speed of children leaving the activity zone. It should also include a double vehicle access gate for maintenance purposes. Seating should be provided in appropriate locations and quantities for accompanying adults to sit. This presence increases the safety of the children that use the site. Several bins should also be provided to collect any litter that may arise. A notice, indicating the name of the site, usage age of the facility, that dogs are excluded from the site and provide the contact details of the site operator to report any incidents/damage to the site.

Allotments

Task Works

Rate

Measure per hectare Cost per ha inc uplifts
£

Pathways and car park

Provide and install car park

£34.00

per m2

50

m2

£1,880.20

Provide hardcore access road

£25.00

per m2

600

m2

£16,590.00

Signage

Supply POS signs

£1,500.00

ea

1

no

£1,659.00

Fencing

Permanent fencing to f perimeter (1.8m galvanised palisade)

£65.00

per lin m

400

lin m

£28,756.00

Supply security gate

£1,500.00

ea

1

no

£1,659.00

water

Supply and install stand pipes

£1,000.00

ea

8

no

£8,848.00

bins

Supply and install bins

£250.00

ea

3

no

£829.50

total

£60,221.70

land cost per ha

£24,000.00

Provision rate per 1000 pop (Ha)

0.35

Rate per person refurb

£21.08

Rate per person new provision

£29.48

Greenways or Green Corridors
Calculated for a 3m wide route per linear metre

Task Works

Rate

Measure per km Cost per km inc uplifts
£

Clearance

Clear virgin ground

£1.11

per m

1000

km

£1,227.66

Excavations and laying base(disposal on site)

Reduce levels and remove spoil to dump on site; lay 150 mm hardcore well rolled;
lay 25 mm sand blinding and geofabric; fix timber edge 150 x 38 mm to both sides of
straight paths; lay 50 mm Cedec gravel watered and rolled

£73.00

per m

1000

km

£80,738.00

Trees

Supply trees

£75.00

1no

30

no

£2,488.50

Plant trees with underground anchors

£51.43

1no

30

no

£1,706.45

Fencing and gates

2 access gates per km and 100m barrier fencing

£2,300.00

1 no

1

no

£2,543.80

Seating

Supply and install seats

£550.00

ea

3

no

£1,824.90

Bins

Supply and install dog bins

£350.00

ea

3

no

£1,161.30

total

£91,690.61

land cost per ha

£30,000.00

Provision rate per 1000 pop (Ha)

1.3

Rate per person refurb

£119.20

Rate per person new provision

£158.20

Average provision required for sustainable transport calculated as being 1km for for every 100 dwellings (230 population).

Equates to 4.34km per 1000 population.

3.3 linear km of route provides one ha of greenway (3m wide), giving a provision rate per 1000 population of 1.3 ha per 1000 population.

Cemeteries and Burial Grounds

Task Works Rate Measure per hectare Cost per ha
£

Clearance

Clear virgin ground

£0.37

per m2

10000

m2

£4,092.20

Pathways and car park

Provide and install 5% car park

£34.00

per m2

500

m2

£18,802.00

Provide 15% tarmac paths

£34.00

per m2

1500

m2

£56,406.00

Shrubs

provide 5% formal shrub planting

£20.00

per m2

500

m2

£11,060.00

Prepare and plant

£3.92

per m2

500

m2

£2,167.76

Grass

Grass at 75%

£0.00

supply and spread topsoil to 150mm

£4.68

per m2

7500

m2

£38,820.60

prepare grass areas

£2.19

per m2

7500

m2

£18,166.05

Supply and sow grass seed

£2.19

per m2

7500

m2

£18,166.05

Trees

Supply trees

£75.00

1no

20

no

£1,659.00

Plant trees with underground anchors

£51.43

1no

20

no

£1,137.63

Signage

Supply signs

£1,500.00

ea

2

no

£3,318.00

Hedging

Provide ornamental hedging

£8.80

per lin m

150

no

£1,459.92

Plant hedge

£5.76

per lin m

150

no

£955.58

Fencing

Permanent fencing to perimeter (post and rail)

£78.67

per lin m

400

no

£34,803.61

water

install standpipes

£1,000.00

ea

5

no

£5,530.00

burial slabs

supply/ install 5 years burial slabs

£24.40

ea

400

no

£10,794.56

row markers

supply/ install markers

£8,000.00

set

1

no

£8,848.00

Seating

Supply and install seats

£550.00

ea

6

no

£3,649.80

Bins

Supply and install litter bins

£300.00

ea

8

no

£2,654.40

total

£242,491.16

land cost per ha

£24,000.00

Provision rate per 1000 pop (Ha)

0.325

Rate per person refurb

£78.81

Rate per person new provision

£86.61

Assume 50% burial and 50% ashes

Therefore each interment uses average 3.75m2 per burial

Therefore provision rate per 1000 pop 0.375 ha

Each burial uses 7m2

Each ashes burial uses 0.5m2

Therefore 7.5 / 2 = 3.75m2 ave